Maintenance
Strategy Development
Fundamental to the reliability of plant and equipment is a well
constructed Maintenance Strategy and associated maintenance plans,
detailing the Preventive Maintenance and Predictive Maintenance
requirements for all plant assets.
AMS take our clients through the development of a sound Maintenance
Strategy following tried and proven methodologies
|
The AMS methodology follows the
following 10 step process
|
- Determine the business objectives, operational and maintenance
requirements,
- Carry out an analysis of operational requirements and
constraints
- Identify all plant equipment and components
- Identify the criticality of each piece of equipment in relation
to the overall operation and the business
- Conduct failure analysis on each piece of equipment
- Determine the appropriate strategy for each piece of equipment
eg. run to failure, condition based, time based etc
- Determine the most appropriate maintenance actions to predict
or prevent failure
- Eliminate actions that do not meet the business
requirements
- Compile appropriate actions in to like categories based on
trade type, frequency, access etc
- Enter the grouped actions, in an appropriate format, as
Standard work the CMMS
|
| |
Our experience has proven that the best results
are obtained by utilising a small number of experienced site
personnel to work with our consultants on an as required basis to
add ownership to the process and also to educate the site personnel
in the process of developing maintenance plans.
This process has proven particularly effective at developing
maintenance plans as a new plant or piece of equipment is being
constructed. This allows the equipment to be started with a
detailed maintenance plan in place on day one of operation.
Maintenance System Review
Maintenance Plan Implementation
CMMS Implementation
|
|